test(sync): observe receiver admission after cancellation - #80
Closed
rldyourmnd wants to merge 1 commit into
Closed
rldyourmnd wants to merge 1 commit into
rldyourmnd wants to merge 1 commit into
Conversation
This was referenced Oct 2, 2026
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
The canceled-transfer resume fixture slept 150 ms and assumed the receiver journal had been released; full Ubuntu CI correctly refused the immediate reopened journal while a filesystem operation retained its lock. Observe typed receiver admission within three seconds before the single resumed transfer, join sender cancellation, require hash-named part progress and retain byte-identity/reduced-refetch assertions.
A real-lock regression shows that 150 ms elapsed is insufficient and verifies admission after actual release. macOS sync E2E: 15 passed, 0 failed, 0 ignored; strict all-target/all-feature sync lint and formatting passed. Native Linux sync E2E also passed: 15 passed, 0 failed, 0 ignored; strict all-target/all-feature sync lint and formatting passed. Runtime/wire/automatic operation replay are unchanged. The original failure and measurement boundary are retained in docs/reports/rds-sync-release-fence-20261002.md.
Fixes #79.
Full Ubuntu and both native CI lanes passed. Full macOS CI failed in the existing real-clock
admission_pause_does_not_report_encoder_starvationfixture (session.rs:1871, one miss versus expected zero): original job. This PR remains open until that separate clock boundary is repaired and all required checks pass. The failure is not suppressed or counted as green.