Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
11 changes: 7 additions & 4 deletions docs/design/2026_06_12_proposed_scaling_roadmap.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,22 +4,25 @@
**Author:** bootjp
**Date:** 2026-06-12

> **Superseded roadmap index:**
> This document is retained as the original sequencing and SLO record. It is
> not an implementation specification and must not be used as the scope for a
> combined implementation PR. The
> [2026-06-23 roadmap](2026_06_23_proposed_scaling_roadmap.md) audits the current
> implementation, closes completed prerequisites, and tracks the remaining
> work as separate design documents and milestone PRs.

> work as separate design documents and milestone PRs. It is the current
> ownership and sequencing authority; this historical document does not
> describe the current implementation status of its milestones.
>
> This roadmap captures the scaling work elastickv needs across four
> subsystems that today have known ceilings and have not yet been
> designed past those ceilings. The roadmap itself is not a single
> milestone — it sequences the work and points each subsystem at a
> sibling `*_proposed_*.md` design that will land later as its own PR.
> Per CLAUDE.md the design-doc-first workflow applies: each milestone
> below ships its own `*_proposed_*` doc before its implementation
> starts; this file is the shared north star and the sequencing
> constraint between them.
> starts. The June 23 ownership index now records the authoritative
> requirement-by-requirement disposition and sequencing constraints.

## 1. Motivation

Expand Down
Loading
Loading