Skip to content

Pull requests: openshift/release

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

USHIFT-7167: Update ami references approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#80025 opened Jun 3, 2026 by pacevedom Contributor Loading…
Add ignoreDifferences for MachineSet boot images to appset-cluster-hosted-mgmt approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80024 opened Jun 3, 2026 by redhat-chai-bot Contributor Loading…
Add rhobs observability-operator 4.22 staging job on GCP do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80023 opened Jun 3, 2026 by DavidRajnoha Contributor Draft
MGMT-24454: update CAPOA CI build root to Go 1.26.2 jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#80022 opened Jun 3, 2026 by shay23bra Loading…
Switch e2e-parallel to westus3 approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80021 opened Jun 3, 2026 by roivaz Contributor Loading…
Add an infra debug optional job approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80020 opened Jun 3, 2026 by roivaz Contributor Loading…
METAL-1606: ofcir-system: drop kube-rbac-proxy and route API over http approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80019 opened Jun 3, 2026 by elfosardo Contributor Loading…
adding retry to http store approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80018 opened Jun 3, 2026 by eifrach Contributor Loading…
Add Konflux jobs for running smoke on 4.21-4.23
#80012 opened Jun 3, 2026 by rabin-io Contributor Loading…
Remove kcm-o old ci jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80011 opened Jun 3, 2026 by gangwgr Contributor Draft
[WIP] Apply CiliumNetworkPolicy for DNS do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#80010 opened Jun 3, 2026 by mgencur Contributor Loading…
[PERFSCALE-4878] fix: add authentication to Quay API requests for prega-operators approved Indicates a PR has been approved by an approver from all required OWNERS files. network-access-rehearsals-ok
#80009 opened Jun 3, 2026 by sraviteja-maker Contributor Loading…
Add Shira Ezra to nvidia-gpu-operator step-registry OWNERS rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#80007 opened Jun 3, 2026 by ShiraEzra Loading…
ROSAENG-23864: add upgrade testing/step for rosa hcp approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#80006 opened Jun 3, 2026 by bmeng Contributor Loading…
[rhosdt] Fix OpenTelemetry Operator CI: Go 1.26 builder and opentelemetry-operator-system namespace approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80005 opened Jun 3, 2026 by IshwarKanse Member Loading…
3 tasks
NETOBSERV-2748 e2etests images and pre-merge tests
#80004 opened Jun 3, 2026 by memodi Contributor Loading…
Sync Serverless CI config/ needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#80001 opened Jun 2, 2026 by serverless-qe Contributor Loading…
feat(hypershift/gcp): migrate CI step scripts to WIF authentication (GCP-583) approved Indicates a PR has been approved by an approver from all required OWNERS files.
#80000 opened Jun 2, 2026 by cristianoveiga Contributor Loading…
3 tasks done
Sync downstream ovnk payload configs...
#79999 opened Jun 2, 2026 by afcollins Contributor Loading…
Crucible Network dataplane test (iperf) TCP and UDP rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#79998 opened Jun 2, 2026 by smandaRH Contributor Loading…
Add install-trustee-operator step to azure-ipi-coco test approved Indicates a PR has been approved by an approver from all required OWNERS files.
#79996 opened Jun 2, 2026 by tbuskey Contributor Loading…
USHIFT-7116: add microshift-release-evaluation periodic job approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#79994 opened Jun 2, 2026 by agullon Contributor Draft
5 tasks
RHOAIENG-63787: Update Openshift CI to use new Go version jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#79993 opened Jun 2, 2026 by CiaraM100104 Loading…
OPCT-420: Add OPCT conformance upgrade periodic jobs for platform-external on AWS jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. rehearsals-ack Signifies that rehearsal jobs have been acknowledged
#79992 opened Jun 2, 2026 by redhat-chai-bot Contributor Loading…
OCPBUGS-86879: pre-install skopeo for OCL e2e tests approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#79990 opened Jun 2, 2026 by umohnani8 Contributor Loading…
ProTip! Filter pull requests by the default branch with base:main.