-
Notifications
You must be signed in to change notification settings - Fork 168
Pull requests: istio/ztunnel
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
[release-1.28] add unsafe marker to ctor annotations + bump ctor to 1.0
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#1920
opened May 25, 2026 by
PetrMc
Member
Loading…
Bump rustls-webpki from 0.103.10 to 0.103.13 in /fuzz in the cargo group across 1 directory
dependencies
Pull requests that update a dependency file
ok-to-test
Set this label allow normal testing to take place for a PR not submitted by an Istio org member.
rust
Pull requests that update rust code
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#1919
opened May 25, 2026 by
dependabot
Bot
Loading…
Resolve DNS for headless service pods
needs-ok-to-test
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#1918
opened May 22, 2026 by
mzacho
Contributor
Loading…
feat: re-arm xds readiness after sustained disconnect
needs-ok-to-test
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#1910
opened May 18, 2026 by
iandvt
Loading…
identity: add workload certificate expiry metric
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1889
opened May 5, 2026 by
jlojosnegros
Contributor
Loading…
update rustls-openssl to include hkdf_info fix from upstream
needs-ok-to-test
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1874
opened Apr 23, 2026 by
zmiklank
Contributor
Loading…
Add runtime TLS configuration via xDS MeshSettings
ok-to-test
Set this label allow normal testing to take place for a PR not submitted by an Istio org member.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#1861
opened Apr 22, 2026 by
zmiklank
Contributor
Loading…
[release-1.27] fix test_stats_exist for prometheus-client 0.24.1
release-notes-none
Indicates a PR that does not require release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#1844
opened Apr 9, 2026 by
istio-testing
Contributor
Loading…
specify target service hostname instead of address for waypoint dest
do-not-merge/work-in-progress
Block merging of a PR because it isn't ready yet.
needs-ok-to-test
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1776
opened Mar 10, 2026 by
garrettheel
•
Draft
warn when own certificate appears in a configured CRL
ok-to-test
Set this label allow normal testing to take place for a PR not submitted by an Istio org member.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1766
opened Feb 25, 2026 by
jlojosnegros
Contributor
Loading…
Add cert expiration metrics
needs-rebase
Indicates a PR needs to be rebased before being merged
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1757
opened Feb 11, 2026 by
Stevenjin8
Contributor
Loading…
Add ENABLE_OUTBOUND_ORIG_SRC config for outbound source IP preservation
ok-to-test
Set this label allow normal testing to take place for a PR not submitted by an Istio org member.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#1749
opened Feb 4, 2026 by
bekerr1
Loading…
[RFC] Update WDS definition to include service scope
needs-rebase
Indicates a PR needs to be rebased before being merged
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#1708
opened Jan 9, 2026 by
krinkinmu
Contributor
Loading…
More process metrics
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#1703
opened Dec 23, 2025 by
Stevenjin8
Contributor
Loading…
Provide Spire Workload Attestation Support to ztunnel
needs-ok-to-test
needs-rebase
Indicates a PR needs to be rebased before being merged
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#1676
opened Nov 21, 2025 by
MikeZappa87
Contributor
Loading…
Add transparent network policy support for HBONE connections
do-not-merge/work-in-progress
Block merging of a PR because it isn't ready yet.
needs-ok-to-test
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1665
opened Nov 12, 2025 by
electricjesus
•
Draft
Dns/fix cname
do-not-merge/work-in-progress
Block merging of a PR because it isn't ready yet.
needs-rebase
Indicates a PR needs to be rebased before being merged
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#1530
opened Apr 17, 2025 by
howardjohn
Member
•
Draft
ProTip!
no:milestone will show everything without a milestone.