chore(straymark): architecture model + retroactive close of CHARTER-12/13/14#37

Merged
montfort merged 1 commit into
mainfrom
chore/architecture-model-and-charter-closes
Jul 19, 2026
Merged

chore(straymark): architecture model + retroactive close of CHARTER-12/13/14#37
montfort merged 1 commit into
mainfrom
chore/architecture-model-and-charter-closes

Conversation

@montfort

Copy link
Copy Markdown
Contributor

Two StrayMark governance items, surfaced while mapping the architecture with /straymark-architecture.

Architecture model (.straymark/architecture/)

Refined the generate seed into real intent:

  • 8 layers (Native FFI → Core → Versioning → Engine Adapters → Server → Persistence → Samples → Tests).
  • All 9 components reassigned out of the placeholder unassigned layer.
  • 14 dependency links matching docs/architecture.md ("dependencies point toward the core").
  • Both model.yml (3D links) and plan.drawio (2D edges) written; straymark architecture validate is green.

Retroactive close of CHARTER-12/13/14

Their code was merged (PRs #28/#29/#30) but charter close was never run — so status --where correctly flagged three phantom in-progress Charters. Closed all three with minimal, honest telemetry: facts on record only (declared effort L/S/L, real AILOG ids, completed_as_planned, no scope change); subjective/unmeasured fields (satisfaction, effort drift, external audit) omitted as honest gaps, not invented. Each .telemetry.yaml notes it is a retroactive minimal close.

Result: all 14 Charters closed; status --where now shows "no in-progress Charter".

The architecture model is EXPERIMENTAL (Loom A1.x), not part of the supported Framework/CLI contract.

🤖 Generated with Claude Code

…2/13/14

Two governance housekeeping items surfaced while mapping the architecture:

- Architecture model (.straymark/architecture/): refined the `generate` seed into
  8 real layers (Native FFI → Core → Versioning → Engine Adapters → Server →
  Persistence → Samples → Tests), reassigned all 9 components out of `unassigned`,
  and wired 14 dependency links matching docs/architecture.md. Both model.yml
  (3D links) and plan.drawio (2D edges) updated; `architecture validate` green.

- Retroactive close of CHARTER-12/13/14: their code was merged (PRs #28/#29/#30)
  but `charter close` was never run, so `status --where` correctly flagged three
  phantom in-progress Charters. Closed all three with minimal, honest telemetry —
  facts on record only (declared effort, real AILOG ids, no scope change);
  subjective/unmeasured fields omitted as honest gaps. `status --where` now shows
  "no in-progress Charter". All 14 Charters are `closed`.

Note: the architecture model is EXPERIMENTAL (Loom A1.x), not part of the
supported Framework/CLI contract.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
@montfort
montfort merged commit 1ca2fb1 into main Jul 19, 2026
18 checks passed
@github-actions github-actions Bot locked and limited conversation to collaborators Jul 19, 2026
Sign up for free to subscribe to this conversation on GitHub. Already have an account? Sign in.

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant