Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
21 changes: 19 additions & 2 deletions docs/roadmap/ai-gaming-opportunities.md
Original file line number Diff line number Diff line change
@@ -1,6 +1,6 @@
# OpenController AI and Gaming Opportunity Goal

**Status:** Cycle 1 merged in PRs #1–#4. Cycle 2 issues #8 and #9 merged in PRs #12 and #13; #10 remains deferred. Cycle 3 issue #14 merged in PR #19; #15 remains deferred. Cycle 4 issue #22 merged in PR #25; gate #23 closed in PR #30. Cycle 5 issue #27 merged in PR #32; gate #29 closed in PR #36 at `f44fe793ea4fef069c2a187084fcaa536848b336`. Cycle 6 issue #20 merged in PR #38 at `f20aab9ea80be7e01b5337c9000b6322f4a8bb5d`; gate #35 and milestone 5 closed in PR #43. Cycle 7 gate #37 is open in milestone 6; this decision records its source log, selection, and DAG before implementation begins. Selected wave: #39–#42, #45, and #47; #44 and #46 are deferred. Whole-match regression baselines and Reddit/accessibility coverage remain open gaps. GitHub Project V2 creation is blocked by the integration's missing Projects write access; repository milestones, labels, and issue dependencies track the DAG.
**Status:** Cycle 1 merged in PRs #1–#4. Cycle 2 issues #8 and #9 merged in PRs #12 and #13; #10 remains deferred. Cycle 3 issue #14 merged in PR #19; #15 remains deferred. Cycle 4 issue #22 merged in PR #25; gate #23 closed in PR #30. Cycle 5 issue #27 merged in PR #32; gate #29 closed in PR #36 at `f44fe793ea4fef069c2a187084fcaa536848b336`. Cycle 6 issue #20 merged in PR #38 at `f20aab9ea80be7e01b5337c9000b6322f4a8bb5d`; gate #35 and milestone 5 closed in PR #43. Cycle 7 gate #37 closed in PR #48; all six selected issues (#39–#42, #45, #47) are implemented and merged in PRs #49–#54, and this closeout records their results before milestone 6 closes. #44 and #46 remain deferred. Whole-match regression baselines and Reddit/accessibility coverage remain open gaps. GitHub Project V2 creation is blocked by the integration's missing Projects write access; repository milestones, labels, issue dependencies, and recurring goal issue #55 track the DAG.

## Product goal

Expand Down Expand Up @@ -381,7 +381,7 @@ Selected issue [#20](https://github.com/SYMBaiEX/OpenController/issues/20) merge

Validation passed: the focused native CLI tests reported 27 passing; typecheck passed; `bun run release:check` passed with 173 tests and its lint, build, audit, and package checks; `git diff --check` passed. GitHub CI's test check passed. An independent gpt-6-luna review of exact head `2a8a5f23b50ca5affecbe72e20bf62d308de1c74` found and reported a CLI error-visibility blocker; the fix was made and re-reviewed with no remaining blockers. CodeRabbit's check was green with a rate-limit note.

Roadmap closeout [PR #43](https://github.com/SYMBaiEX/OpenController/pull/43) closed Cycle 6 research gate [#35](https://github.com/SYMBaiEX/OpenController/issues/35) and milestone 5. Cycle 7 research gate [#37](https://github.com/SYMBaiEX/OpenController/issues/37) is open in milestone 6 and is no longer blocked by #35. The decision below completes its evidence-backed backlog, prioritization, and build-lane selection; implementation starts after the decision PR closes #37.
Roadmap closeout [PR #43](https://github.com/SYMBaiEX/OpenController/pull/43) closed Cycle 6 research gate [#35](https://github.com/SYMBaiEX/OpenController/issues/35) and milestone 5. Cycle 7 research gate [#37](https://github.com/SYMBaiEX/OpenController/issues/37) closed in PR #48 after completing its evidence-backed backlog, prioritization, and build-lane selection; implementation started after that decision PR.

GitHub Project V2 creation was retried during this cycle with the authenticated `SYMBaiEX` account. GitHub returned `Resource not accessible by integration (createProjectV2)`, and no existing Project V2 was listed. The DAG remains tracked through repository milestones, issue labels, and native issue dependencies until Projects write access is granted.

Expand Down Expand Up @@ -447,6 +447,23 @@ DAG:

**Decision:** select #39, #40, #41, #42, #47, and #45 (stacked after #41). Keep #44 and #46 out of the active milestone until protocol/helper ownership prerequisites are met. Cycle 7 continues the research -> build -> independent review -> merge -> next research gate loop. GitHub Project V2 remains blocked by integration write permission, so milestone 6, cycle labels, and issue dependencies carry the plan.

## Cycle 7 implementation closeout (2026-10-05)

All six selected issues are closed by their merged implementation PRs. The `test` CI check and CodeRabbit status passed on each final PR head; CodeRabbit noted rate limits during review on some PRs, so Luna reviews independently inspected the exact heads.

| Issue | PR and merge commit | Result and validation |
| --- | --- | --- |
| [#41](https://github.com/SYMBaiEX/OpenController/issues/41) | [#49](https://github.com/SYMBaiEX/OpenController/pull/49), `a4900acd6151c9782e9d5c608a98d96746f905da` | Clarified keyboard/mouse profile report semantics. Focused conformance coverage and independent review passed. |
| [#45](https://github.com/SYMBaiEX/OpenController/issues/45) | [#52](https://github.com/SYMBaiEX/OpenController/pull/52), `db220d3938415b1834bb59db888f9f63962cf9aa` | Documented motion values, axes, and coordinate-frame limits after #41. Independent review confirmed docs match implementation and conformance boundaries. |
| [#47](https://github.com/SYMBaiEX/OpenController/issues/47) | [#50](https://github.com/SYMBaiEX/OpenController/pull/50), `c3657d3d9747503f45a39918c5e9eca994ddc165` | `disconnectAll` waits for all attempts, removes successes, retains failed controllers and original errors. Focused tests (4/4), root typecheck/build, and independent review passed. |
| [#40](https://github.com/SYMBaiEX/OpenController/issues/40) | [#51](https://github.com/SYMBaiEX/OpenController/pull/51), `cb1038e43b9f5d377c9e41f309210d5167909593` | Added a dry-run-first, allowlisted MCP controller example with sanitized failures and guaranteed cleanup. Smoke, typecheck/build, and independent exact-head review passed. |
| [#39](https://github.com/SYMBaiEX/OpenController/issues/39) | [#53](https://github.com/SYMBaiEX/OpenController/pull/53), `c7b744ed93a8c2d306f5c76e1b0c550eb0382c70` | Timed presses release on cancellation and preserve post-press, release, and neutralization errors. Final-head validation: focused tests (11/11), core suite (76/76), typecheck/build, targeted Biome, and independent review passed. |
| [#42](https://github.com/SYMBaiEX/OpenController/issues/42) | [#54](https://github.com/SYMBaiEX/OpenController/pull/54), `b7b69951a2e51f60990c35dd34c35d90004b70b4` | Added offline per-command state-transition verification, mismatch/unverifiable diagnostics, and malformed-event validation. Final-head validation: CLI suite (40/40), typecheck/build, targeted Biome, built CLI checks, CI, and independent exact-head review passed. |

The implementation DAG is complete: #41 -> #45, with #39, #40, #42, and #47 on independent lanes. All selected PRs merged after focused validation and independent review. #44 remains deferred pending an agreed adaptive-trigger direction, schema, capability negotiation, and actuator consumer; #46 remains deferred pending an owned helper readiness protocol and lifecycle semantics.

Cycle 7 research gate #37 and selected implementation issues are closed. The next research sweep is tracked under recurring goal [#55](https://github.com/SYMBaiEX/OpenController/issues/55); create the next cycle's gate, milestone, and candidate DAG after the source log and repository-fit review are complete. GitHub Project V2 remains unavailable to this integration because `createProjectV2` returns `Resource not accessible by integration`; use milestone, labels, and issue dependencies until Projects write access is restored.

## Branch and swarm operating rules


Expand Down
Loading