Forecast-ledger entry 21: scope bifurcation (milestone A unmoved; headline follows the Q5-gated successor authority) - #407
Merged
Conversation
…g (supersedes 20) Registers the 2026-08-20 material evidence: limb-IV triple-verified 46-collision census dispositioned (all lawfully unresolved_multiple), the v3 reconstruction green at HEAD with the span/collapse fix-5 gap, the Q5 coverage audit (COMPLETABLE-LARGE, >=4,300 lane-hours over the 257-document denominator), and the ceremony lane's shadow-route ruling from the enacted three-union law. Milestone A (revision-22 ratification, framework + exact shadows) is not gated by Q5: p50 2026-09-08 / p80 2026-09-22. Milestone B (R04-normal successor authority + publication, the resolution event) absorbs the Q5 program: headline p50 2026-10-14 / p80 2026-12-02 (+20/+34 days vs entry 20). Engine-assumptions clause attached per the program board. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Registers forecast-ledger entry 21, superseding entry 20 per ledger rule 5 (material evidence), append-only.
Evidence registered (2026-08-20): limb-IV 46-collision census triple-verified and dispositioned (all lawfully
unresolved_multiple, C68 untouched; §34.5.1's pre-R04 obligation dischargeable); the v3/§19.3.2 reconstruction green at HEAD (17,313 evidence / 21,971 candidate-set rows) hash-stable up to the unenacted span/collapse convention (fix-5 item 1); Q5 coverage audit COMPLETABLE-LARGE (0/257 documents complete; ≥4,300 lane-hours); the shadow-route ruling from the enacted three-union law (revision-22 ratification NOT Q5-gated; the successor authority IS).Bifurcation: milestone A (revision-22 ratification, framework + exact shadows) p50 2026-09-08 / p80 2026-09-22. Milestone B (R04-normal successor authority + publication — the claim's resolution event) p50 2026-10-14 / p80 2026-12-02; the headline follows B (+20/+34 days vs entry 20). Engine-assumptions clause attached verbatim from the program board.
Validated: tests/test_forecast_ledger.py 5/5; ruff clean; append-only diff (entry 20 gains only status + superseded_by).
🤖 Generated with Claude Code