Register timeline forecast entry 20 (supersedes 19) - #404

Merged
MaxGhenis merged 1 commit into
masterfrom
claude/ledger-entry-20
Aug 17, 2026
Merged

Register timeline forecast entry 20 (supersedes 19)#404
MaxGhenis merged 1 commit into
masterfrom
claude/ledger-entry-20

Conversation

@MaxGhenis

Copy link
Copy Markdown
Contributor

Summary

Append-only supersession per docs/forecasts/README.md: entry 19 flips to superseded (dates untouched); entry 20 registers p50 2026-09-24 / p80 2026-10-29 on the identical claim and criterion. Rule-5 material evidence — measured, not modeled:

  1. Both arms cleared their reliability bars with production-rate measurements. Missing-reason dual-review pipeline: ranks 1–340 reconciled at 98–100% exact agreement (zero unresolvable), frontier at 640/990 after seven ~2–3h three-lane waves. Purpose arm: the rubric-v2 cure measured 96.67% blinded dual-pass agreement with cured q_p 107.66/lane-hour (~6× the alert-era rate priced into entry 19), lifting the hold; production adjudication has begun.
  2. At measured rates the adjudication stages compress from months to weeks: the remaining ~49k missing-reason rows and the 21,102-prompt purpose residue both project to 2–3 calendar weeks of continuous waves.
  3. Ceremony latency dropped: CI pytest is now 4-way sharded per Python version (Shard CI pytest 4 ways per Python version (fan-in keeps protected contexts) #402), compounding across the A20 ceremony, revision-22 activation, tier-2 R04/R05, R06, and the reconstruction-to-publication chain.
  4. Structure unchanged; the p80 buffers the observed ≥1-unplanned-ceremony-per-stage rate; dates conditional on lawful total settlement under the enacted kill criteria.

Ledger test 5 passed; black + ruff clean; indent=1 preserved.

🤖 Generated with Claude Code

Both campaign arms now have measured, reliability-cleared production
adjudication rates: the missing-reason pipeline reconciles at 98-100%
agreement (frontier rank 640/990 after seven waves) and the purpose
arm's rubric-v2 cure measured 96.67% blinded dual-pass agreement at
q_p 107.66/lane-hour (6x the alert-era rate), lifting its hold. At
measured rates the adjudication stages compress from months to weeks,
and the 4-way CI shard (#402) cuts ceremony gate latency. p50 moves
2026-11-09 to 2026-09-24; p80 2027-01-22 to 2026-10-29.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@vercel

vercel Bot commented Aug 17, 2026

Copy link
Copy Markdown

The latest updates on your projects. Learn more about Vercel for GitHub.

Project Deployment Actions Updated (UTC)
social-security-model Ready Ready Preview Aug 17, 2026 11:49am

Request Review

@MaxGhenis
MaxGhenis merged commit 687ba5d into master Aug 17, 2026
10 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant