Register timeline forecast entry 20 (supersedes 19) - #404
Merged
Conversation
Both campaign arms now have measured, reliability-cleared production adjudication rates: the missing-reason pipeline reconciles at 98-100% agreement (frontier rank 640/990 after seven waves) and the purpose arm's rubric-v2 cure measured 96.67% blinded dual-pass agreement at q_p 107.66/lane-hour (6x the alert-era rate), lifting its hold. At measured rates the adjudication stages compress from months to weeks, and the 4-way CI shard (#402) cuts ceremony gate latency. p50 moves 2026-11-09 to 2026-09-24; p80 2027-01-22 to 2026-10-29. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
|
The latest updates on your projects. Learn more about Vercel for GitHub.
|
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
Append-only supersession per
docs/forecasts/README.md: entry 19 flips to superseded (dates untouched); entry 20 registers p50 2026-09-24 / p80 2026-10-29 on the identical claim and criterion. Rule-5 material evidence — measured, not modeled:q_p107.66/lane-hour (~6× the alert-era rate priced into entry 19), lifting the hold; production adjudication has begun.Ledger test 5 passed; black + ruff clean; indent=1 preserved.
🤖 Generated with Claude Code