Repository navigation
Give the VIPM package build enough time on the runner - #32
Merged
Merged
Conversation
The test package build failed on every pull request since 2026-10-17 21:45 UTC with "vipm_build made no progress for 600 s". A build of this package in LabVIEW 2020 takes about 23 minutes on the runner and its last phase reports nothing for about 10 of them: the builds that passed finished after 23 minutes, the ones that failed were cut off at 23.5 minutes, 600 s after the last progress. Whether a build passed came down to a few seconds. In both workflow templates: - VIPM_DESKTOP_LIVELINESS_TIMEOUT 600 -> 1500 s - VIPM_CLI_TIMEOUT 1200 -> 2400 s - the build step's timeout-minutes 25 -> 50 (the build itself took 23) These are the templates; the live workflows are changed by copying them over .github/workflows/pull-request.yml and release.yml. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
Tests✅ All 50 tests passed. Per-test results
Protocol tests✅ Protocol tester output (0 failed required checks)VI diff reportNo VI, VIM or CTL files changed in this pull request. Report for commit 1689ee5. The installable test package is under Artifacts of this run once the build job has finished. |
This was referenced Oct 18, 2026
JanGoebel
pushed a commit
that referenced
this pull request
Oct 18, 2026
Brings in the VIPM build timeouts of the live workflows (#32 and the workflow commits on main), so this pull request's checks run with them. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Summary
The test package build has failed on every pull request since yesterday 21:45 UTC (#29, #30, and #31 so far) with
VIPM command 'vipb_build' made no progress for 600.0s. The tests and the VI diff pass in those runs; only the build step fails.The cause is timing, not the code:
#29 changes only CI scripts and no VIs, and it fails the same way. That rules out the VIs as the cause.
Changes
In
tools/ci/pull-request.workflow.ymlandtools/ci/release.workflow.yml, in the step "Build VI Package via VIPM CLI":VIPM_DESKTOP_LIVELINESS_TIMEOUT: 600 → 1500 s. 25 minutes of silence still ends a VIPM that really hangs.VIPM_CLI_TIMEOUT: 1200 → 2400 s.timeout-minutes: 25 → 50. The build alone took 23 minutes, so the old step limit was nearly reached as well.Verified
Not verified
.github/workflows, which only the maintainer can change, and pull request runs take their CI scripts from main.Earlier explanation withdrawn
On #30 I suggested that LabVIEW 2020 was being reached on the wrong VI Server port. That was wrong. The runner is a different machine (
PVE-W-11247-202-Runner), and I had read the port numbers of the development machine.Maintainer steps
tools/ci/pull-request.workflow.ymlto.github/workflows/pull-request.yml.tools/ci/release.workflow.ymlto.github/workflows/release.yml.test-buildjobs of Show every case frame of changed VIs in the detailed diff report #29, Describe tool outputs, title and annotations, and return validation errors as results #30 and Serve MCP 2026-07-28 next to the initialize handshake, with elicitation #31.🤖 Generated with Claude Code