Skip to content

✨ DASHBOARD - roadmap 4.12 to 4.15 - #10

Merged
DevManfre merged 2 commits into
devfrom
feat/roadmap-4-12-to-4-15
Oct 30, 2026
Merged

DevManfre merged 2 commits into
devfrom
feat/roadmap-4-12-to-4-15

Conversation

@DevManfre

Copy link
Copy Markdown
Owner

What

  • 4.12 Incident timeline (Gantt) card on Incidents, fed by GET /incidents/timeline; overlaps between providers are named in text.
  • 4.13 History compare takes up to five providers (--compare-1..5).
  • 4.14 Latency card on History, fed by GET /history/latency (p50/p95 per bucket, slowMs threshold).
  • 4.15 Command palette searches incident titles, operator notes and annotations (GET /search) and component names (from the status already loaded).

Checks

npm test, npm run typecheck, npm run coverage, npm run test:visual (32 views match; the four Incidents frames agreed in their own commit, each looked at), check:bundle ok (667.1 of 669.4 kB gzipped). Redeployed and verified on the running instance.

Notes

  • The JS bundle has about 2 kB of headroom left.
  • Two existing History tests were adjusted: the lazy-drawer request check now ignores /history/latency, and the latency range labels were renamed to not collide with the History range control.

…re and text search in the palette

Roadmap 4.12 to 4.15. Incidents gets a timeline card fed by GET /incidents/timeline, with overlaps between providers named in text. History gets a latency card fed by GET /history/latency (p50 and p95 per bucket, slowMs threshold) and its compare chart now takes up to five providers on --compare-1..5. The command palette searches incident titles, operator notes and annotations through GET /search, and component names from the status it already holds. Both new endpoints and /search are in the OpenAPI spec and docs/api (en and it).
Looked at each frame: the card sits between the hero and the list, the axis labels no longer wrap at the right edge in either locale, and the open and resolved incidents draw as bars in their impact colour.
@DevManfre
DevManfre merged commit 3c2371e into dev Oct 30, 2026
7 checks passed
@DevManfre
DevManfre deleted the feat/roadmap-4-12-to-4-15 branch November 1, 2026 09:16
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant