Project spine. Updated automatically by loops, readable by humans. Don't
hand-edit the log sections below <!-- auto --> markers — edit the spine
fields at the top freely.
| Field | Value |
|---|---|
| Project | loop-engineering |
| Owner | [@github-handle] |
| Secondary owner | [@github-handle] |
| Loop run frequency | daily, 08:00 weekdays (see LOOP.md for cron) |
| Current readiness level | L1 (Verify) |
Last loop-audit run |
2026-06-29 08:04 UTC |
| Open items | 2 |
| ID | Opened | Loop | Description | Status |
|---|---|---|---|---|
| OI-014 | 2026-06-27 | loop-verifier | Verdict inconclusive on dependency-bump fix proposal — confidence 0.41, below threshold |
open, unack'd (2 days, past 24h SLA) |
| OI-013 | 2026-06-24 | loop-triage | Flagged stale lockfile, no fix proposal yet (pre-L2) | open |
- Findings: 3 (1 dependency drift, 2 lint warnings)
- Consecutive clean runs: 11
- False positives this window: 0
- Findings: 1 (dependency drift)
- Consecutive clean runs: 10
- False positives this window: 0
- Verdict: pass
- Reasoning: dependency drift finding matches known-safe minor version bump pattern, no breaking changes in changelog
- Confidence: 0.93
- Consecutive verified runs: 9 (1 short of L1→L2 gate)
- Verdict: inconclusive
- Reasoning: dependency-bump touches a file with no existing test coverage; cannot confirm safety
- Confidence: 0.41
- → opened as OI-014, counted as fail per
verifier_contract.inconclusive_handling
(empty — no rollbacks yet; this loop is below L3, auto-merge is not live for any fix category)
- Gate thresholds referenced above live in
LOOP.md— this file only logs outcomes, it doesn't define the rules. - If
Open Itemshas anything past its SLA (seeLOOP.md→escalation), that's surfaced at the top of the nextloop-triagerun automatically.