Skip to content

Technical Note: Area 4 : Forward Compatibility / Roadmap for future Convergence #20

Description

@woodsmc

Based on the Alternative_Solutions_(WASI_Wasm).md provide technical notes on:

  • Proposed standards process changes for continued standardization based on WASI 0.1 while not slowing WASI 0.2+ / WASI 1.0 RC work

(Perhaps the following would be better as it's own presentation - keep note above focused?)

  • Proposed standard process changes with phase gate quality measured based on NFRs; performance metrics compared to same operation (if possible) in native / WASI 0.1 / CM model.

  • How CM based binaries can execute on non CM enabled core-wasm runtimes

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions