Prepare the first public base-cli-demo v0.1.0 release after the initial learning scenarios have landed.
Scope
- Synchronize uv.lock with the merged optional integration extras.
- Add the 0.1.0 changelog section and current release reference.
- Run the repository validation, full test, package, installed-wheel, and Base release readiness checks.
- Verify the tagged release workflow is ready without publishing yet.
Acceptance criteria
- A clean main branch passes uv lock, repository, test, package, and installed-wheel gates.
- VERSION, README.md, CHANGELOG.md, and base_manifest.yaml agree on v0.1.0.
- basectl release check, plan, notes, and publish --dry-run produce a reviewable release plan.
- Publishing remains a separate explicitly authorized action.
Non-goals
Do not publish v0.1.0 or imply that it is a Base-CLI API stability promise.
Project Fields
- Status: In Progress
- Priority: P2
- Area: Packaging
- Initiative: Base-CLI Demo
- Size: S
Agent Assignment
Summary
Prepare the first public base-cli-demo v0.1.0 release after the initial learning scenarios have landed.
Scope
Acceptance criteria
Non-goals
Do not publish v0.1.0 or imply that it is a Base-CLI API stability promise.