From 6e0fbe9d81ba2b5f7b7220e5a65382899b7bf60c Mon Sep 17 00:00:00 2001 From: Austin Hamilton Date: Mon, 5 Oct 2026 01:03:45 +0000 Subject: [PATCH 1/2] docs(roadmap): close out cycle 7 implementation --- docs/roadmap/ai-gaming-opportunities.md | 21 +++++++++++++++++++-- 1 file changed, 19 insertions(+), 2 deletions(-) diff --git a/docs/roadmap/ai-gaming-opportunities.md b/docs/roadmap/ai-gaming-opportunities.md index 5a2b8e1..3a31f64 100644 --- a/docs/roadmap/ai-gaming-opportunities.md +++ b/docs/roadmap/ai-gaming-opportunities.md @@ -1,6 +1,6 @@ # OpenController AI and Gaming Opportunity Goal -**Status:** Cycle 1 merged in PRs #1–#4. Cycle 2 issues #8 and #9 merged in PRs #12 and #13; #10 remains deferred. Cycle 3 issue #14 merged in PR #19; #15 remains deferred. Cycle 4 issue #22 merged in PR #25; gate #23 closed in PR #30. Cycle 5 issue #27 merged in PR #32; gate #29 closed in PR #36 at `f44fe793ea4fef069c2a187084fcaa536848b336`. Cycle 6 issue #20 merged in PR #38 at `f20aab9ea80be7e01b5337c9000b6322f4a8bb5d`; gate #35 and milestone 5 closed in PR #43. Cycle 7 gate #37 is open in milestone 6; this decision records its source log, selection, and DAG before implementation begins. Selected wave: #39–#42, #45, and #47; #44 and #46 are deferred. Whole-match regression baselines and Reddit/accessibility coverage remain open gaps. GitHub Project V2 creation is blocked by the integration's missing Projects write access; repository milestones, labels, and issue dependencies track the DAG. +**Status:** Cycle 1 merged in PRs #1–#4. Cycle 2 issues #8 and #9 merged in PRs #12 and #13; #10 remains deferred. Cycle 3 issue #14 merged in PR #19; #15 remains deferred. Cycle 4 issue #22 merged in PR #25; gate #23 closed in PR #30. Cycle 5 issue #27 merged in PR #32; gate #29 closed in PR #36 at `f44fe793ea4fef069c2a187084fcaa536848b336`. Cycle 6 issue #20 merged in PR #38 at `f20aab9ea80be7e01b5337c9000b6322f4a8bb5d`; gate #35 and milestone 5 closed in PR #43. Cycle 7 gate #37 closed in PR #48; all six selected issues (#39–#42, #45, #47) are implemented and merged in PRs #49–#54, and this closeout records their results before milestone 6 closes. #44 and #46 remain deferred. Whole-match regression baselines and Reddit/accessibility coverage remain open gaps. GitHub Project V2 creation is blocked by the integration's missing Projects write access; repository milestones, labels, issue dependencies, and recurring goal issue #55 track the DAG. ## Product goal @@ -381,7 +381,7 @@ Selected issue [#20](https://github.com/SYMBaiEX/OpenController/issues/20) merge Validation passed: the focused native CLI tests reported 27 passing; typecheck passed; `bun run release:check` passed with 173 tests and its lint, build, audit, and package checks; `git diff --check` passed. GitHub CI's test check passed. An independent gpt-6-luna review of exact head `2a8a5f23b50ca5affecbe72e20bf62d308de1c74` found and reported a CLI error-visibility blocker; the fix was made and re-reviewed with no remaining blockers. CodeRabbit's check was green with a rate-limit note. -Roadmap closeout [PR #43](https://github.com/SYMBaiEX/OpenController/pull/43) closed Cycle 6 research gate [#35](https://github.com/SYMBaiEX/OpenController/issues/35) and milestone 5. Cycle 7 research gate [#37](https://github.com/SYMBaiEX/OpenController/issues/37) is open in milestone 6 and is no longer blocked by #35. The decision below completes its evidence-backed backlog, prioritization, and build-lane selection; implementation starts after the decision PR closes #37. +Roadmap closeout [PR #43](https://github.com/SYMBaiEX/OpenController/pull/43) closed Cycle 6 research gate [#35](https://github.com/SYMBaiEX/OpenController/issues/35) and milestone 5. Cycle 7 research gate [#37](https://github.com/SYMBaiEX/OpenController/issues/37) closed in PR #48 after completing its evidence-backed backlog, prioritization, and build-lane selection; implementation started after that decision PR. GitHub Project V2 creation was retried during this cycle with the authenticated `SYMBaiEX` account. GitHub returned `Resource not accessible by integration (createProjectV2)`, and no existing Project V2 was listed. The DAG remains tracked through repository milestones, issue labels, and native issue dependencies until Projects write access is granted. @@ -447,6 +447,23 @@ DAG: **Decision:** select #39, #40, #41, #42, #47, and #45 (stacked after #41). Keep #44 and #46 out of the active milestone until protocol/helper ownership prerequisites are met. Cycle 7 continues the research -> build -> independent review -> merge -> next research gate loop. GitHub Project V2 remains blocked by integration write permission, so milestone 6, cycle labels, and issue dependencies carry the plan. +## Cycle 7 implementation closeout (2026-10-05) + +All six selected issues are closed by their merged implementation PRs. The `test` CI check and CodeRabbit status passed on each final PR head; CodeRabbit noted rate limits during review on some PRs, so Luna reviews independently inspected the exact heads. + +| Issue | PR and merge commit | Result and validation | +| --- | --- | --- | +| [#41](https://github.com/SYMBaiEX/OpenController/issues/41) | [#49](https://github.com/SYMBaiEX/OpenController/pull/49), `a490a0acd6151c9782e9d5c608a98d96746f905da` | Clarified keyboard/mouse profile report semantics. Focused conformance coverage and independent review passed. | +| [#45](https://github.com/SYMBaiEX/OpenController/issues/45) | [#52](https://github.com/SYMBaiEX/OpenController/pull/52), `db220d3938415b1834bb59db888f9f63962cf9aa` | Documented motion values, axes, and coordinate-frame limits after #41. Independent review confirmed docs match implementation and conformance boundaries. | +| [#47](https://github.com/SYMBaiEX/OpenController/issues/47) | [#50](https://github.com/SYMBaiEX/OpenController/pull/50), `c3657d3d9747503f45a39918c5e9eca994ddc165` | `disconnectAll` waits for all attempts, removes successes, retains failed controllers and original errors. Focused tests (4/4), root typecheck/build, and independent review passed. | +| [#40](https://github.com/SYMBaiEX/OpenController/issues/40) | [#51](https://github.com/SYMBaiEX/OpenController/pull/51), `cb1038e43b9f5d377c9e41f309210d5167909593` | Added a dry-run-first, allowlisted MCP controller example with sanitized failures and guaranteed cleanup. Smoke, typecheck/build, and independent exact-head review passed. | +| [#39](https://github.com/SYMBaiEX/OpenController/issues/39) | [#53](https://github.com/SYMBaiEX/OpenController/pull/53), `c7b744ed93a8c2d306f5c76e1b0c550eb0382c70` | Timed presses release on cancellation and preserve post-press, release, and neutralization errors. Focused tests (11/11), core suite (76/76), typecheck/build, and independent review passed. | +| [#42](https://github.com/SYMBaiEX/OpenController/issues/42) | [#54](https://github.com/SYMBaiEX/OpenController/pull/54), `b7b69951a2e51f60990c35dd34c35d90004b70b4` | Added offline per-command state-transition verification, mismatch/unverifiable diagnostics, and malformed-event validation. CLI suite (40/40), typecheck/build, targeted Biome, CI, and independent exact-head review passed. | + +The implementation DAG is complete: #41 -> #45, with #39, #40, #42, and #47 on independent lanes. All selected PRs merged after focused validation and independent review. #44 remains deferred pending an agreed adaptive-trigger direction, schema, capability negotiation, and actuator consumer; #46 remains deferred pending an owned helper readiness protocol and lifecycle semantics. + +Cycle 7 research gate #37 and selected implementation issues are closed. The next research sweep is tracked under recurring goal [#55](https://github.com/SYMBaiEX/OpenController/issues/55); create the next cycle's gate, milestone, and candidate DAG after the source log and repository-fit review are complete. GitHub Project V2 remains unavailable to this integration because `createProjectV2` returns `Resource not accessible by integration`; use milestone, labels, and issue dependencies until Projects write access is restored. + ## Branch and swarm operating rules From 6f91053aadd5e3c7ec5b022ec74993dc5dfdf146 Mon Sep 17 00:00:00 2001 From: Austin Hamilton Date: Mon, 5 Oct 2026 01:10:20 +0000 Subject: [PATCH 2/2] docs(roadmap): correct closeout commit and check details --- docs/roadmap/ai-gaming-opportunities.md | 6 +++--- 1 file changed, 3 insertions(+), 3 deletions(-) diff --git a/docs/roadmap/ai-gaming-opportunities.md b/docs/roadmap/ai-gaming-opportunities.md index 3a31f64..9b558af 100644 --- a/docs/roadmap/ai-gaming-opportunities.md +++ b/docs/roadmap/ai-gaming-opportunities.md @@ -453,12 +453,12 @@ All six selected issues are closed by their merged implementation PRs. The `test | Issue | PR and merge commit | Result and validation | | --- | --- | --- | -| [#41](https://github.com/SYMBaiEX/OpenController/issues/41) | [#49](https://github.com/SYMBaiEX/OpenController/pull/49), `a490a0acd6151c9782e9d5c608a98d96746f905da` | Clarified keyboard/mouse profile report semantics. Focused conformance coverage and independent review passed. | +| [#41](https://github.com/SYMBaiEX/OpenController/issues/41) | [#49](https://github.com/SYMBaiEX/OpenController/pull/49), `a4900acd6151c9782e9d5c608a98d96746f905da` | Clarified keyboard/mouse profile report semantics. Focused conformance coverage and independent review passed. | | [#45](https://github.com/SYMBaiEX/OpenController/issues/45) | [#52](https://github.com/SYMBaiEX/OpenController/pull/52), `db220d3938415b1834bb59db888f9f63962cf9aa` | Documented motion values, axes, and coordinate-frame limits after #41. Independent review confirmed docs match implementation and conformance boundaries. | | [#47](https://github.com/SYMBaiEX/OpenController/issues/47) | [#50](https://github.com/SYMBaiEX/OpenController/pull/50), `c3657d3d9747503f45a39918c5e9eca994ddc165` | `disconnectAll` waits for all attempts, removes successes, retains failed controllers and original errors. Focused tests (4/4), root typecheck/build, and independent review passed. | | [#40](https://github.com/SYMBaiEX/OpenController/issues/40) | [#51](https://github.com/SYMBaiEX/OpenController/pull/51), `cb1038e43b9f5d377c9e41f309210d5167909593` | Added a dry-run-first, allowlisted MCP controller example with sanitized failures and guaranteed cleanup. Smoke, typecheck/build, and independent exact-head review passed. | -| [#39](https://github.com/SYMBaiEX/OpenController/issues/39) | [#53](https://github.com/SYMBaiEX/OpenController/pull/53), `c7b744ed93a8c2d306f5c76e1b0c550eb0382c70` | Timed presses release on cancellation and preserve post-press, release, and neutralization errors. Focused tests (11/11), core suite (76/76), typecheck/build, and independent review passed. | -| [#42](https://github.com/SYMBaiEX/OpenController/issues/42) | [#54](https://github.com/SYMBaiEX/OpenController/pull/54), `b7b69951a2e51f60990c35dd34c35d90004b70b4` | Added offline per-command state-transition verification, mismatch/unverifiable diagnostics, and malformed-event validation. CLI suite (40/40), typecheck/build, targeted Biome, CI, and independent exact-head review passed. | +| [#39](https://github.com/SYMBaiEX/OpenController/issues/39) | [#53](https://github.com/SYMBaiEX/OpenController/pull/53), `c7b744ed93a8c2d306f5c76e1b0c550eb0382c70` | Timed presses release on cancellation and preserve post-press, release, and neutralization errors. Final-head validation: focused tests (11/11), core suite (76/76), typecheck/build, targeted Biome, and independent review passed. | +| [#42](https://github.com/SYMBaiEX/OpenController/issues/42) | [#54](https://github.com/SYMBaiEX/OpenController/pull/54), `b7b69951a2e51f60990c35dd34c35d90004b70b4` | Added offline per-command state-transition verification, mismatch/unverifiable diagnostics, and malformed-event validation. Final-head validation: CLI suite (40/40), typecheck/build, targeted Biome, built CLI checks, CI, and independent exact-head review passed. | The implementation DAG is complete: #41 -> #45, with #39, #40, #42, and #47 on independent lanes. All selected PRs merged after focused validation and independent review. #44 remains deferred pending an agreed adaptive-trigger direction, schema, capability negotiation, and actuator consumer; #46 remains deferred pending an owned helper readiness protocol and lifecycle semantics.